01
Raw material
Heat No. + mill certificate reference
Quote-controlled quality system
A controlled Heat-to-Lot workflow can be provided for production orders when specified in the quotation and purchase order. Label fields, inspection scope, barcode format and document package are confirmed before production or pack-out.
Evidence boundary
This page shows a standard control framework and sample label formats. It is not evidence for a current SKU, production batch, inspection result, shipment or certificate. Actual records exist only after an agreed order is produced and reviewed.
Control path
01
Heat No. + mill certificate reference
02
Lot No. linked to the approved heat
03
Finished-product checks linked to the lot
04
MTC / EN 10204 3.1 scope confirmed on quote
05
Inner box, carton and pallet identification
06
Actual records released for the agreed order
Reference formats
The examples below use one consistent demonstration chain: SAMPLE-H001 → SAMPLE-L001. They show layout and field logic only. Customer identity, quantities, weights and final barcode content are approved per quotation.
PisenFasten
RAW MATERIAL LABEL
Reference format only
Not valid for production, inspection, shipment or certificate evidence.
PisenFasten
PRODUCTION LOT LABEL
Reference format only
Not valid for production, inspection, shipment or certificate evidence.
PisenFasten
INNER BOX LABEL
Reference format only
Not valid for production, inspection, shipment or certificate evidence.
PisenFasten
OUTER CARTON LABEL
Reference format only
Not valid for production, inspection, shipment or certificate evidence.
PisenFasten
PALLET LABEL
Reference format only
Not valid for production, inspection, shipment or certificate evidence.
Label content
No. Document availability, test scope and issuing party must be confirmed for the quoted SKU and production lot before the purchase order is accepted.
No. SAMPLE-H001 and SAMPLE-L001 are reference data used only to show the label structure and the intended linkage.
Yes, subject to artwork, field, barcode, MOQ and setup approval during quotation. The final label is approved before production or pack-out.
Redacted case photos may be added only after an approved order has completed production and the customer, supplier and batch information are cleared for public use.
RFQ requirement
Send the SKU or drawing, standard, material, quantity, ship-to country, inspection requirements, required MTC / 3.1 documents, and label or barcode fields. Sales will return the supported scope in the written quote.